このエントリーをはてなブックマークに追加
ID 15769
JaLCDOI
Sort Key
4
FullText URL
Author
Akagi Fumio
Osaki Hirokazu
Kikuchi Susumu
Abstract
An assembly line with no paralleling of work elements and work stations is called a serial line. The cycle time of the serial line must be at least equal to the maximum work element time. To lower the cycle time beyond the limit and increase the production rate, one may permit the paralleling of work elements or work stations. So in this paper we propose the parallel assignment method for achieving a higher production rate. In this method, work elements are assigned to work stations under the multiple upper time limits which are the products of the various numbers of workers and the limiting cycle time. Further we develop the computer program of the proposed method and provide an illustrative problem and computational results.
Publication Title
Memoirs of the School of Engineering, Okayama University
Published Date
1981-03-30
Volume
volume15
Issue
issue2
Publisher
岡山大学工学部
Publisher Alternative
School of Engineering, Okayama University
Start Page
21
End Page
28
ISSN
0475-0071
NCID
AA00733903
Content Type
Departmental Bulletin Paper
OAI-PMH Set
岡山大学
language
English
File Version
publisher
NAID
Eprints Journal Name
mfe